1. Understand Regulations
Regulations on septic systems vary across states, so check with local authorities on current laws and rules that may apply. The state environmental agency and health department will have the necessary information on their websites or at their offices. Do a quick search to identify the governing agency, then go from there.
2. Know the Required Permits
Like most construction projects, installing a septic system requires permits. Again, the necessary paperwork differs from one place to another. Before the local agency issues the permits and gives you the green light, they have to ensure first that your chosen site is suitable for construction. Most septic system installers are familiar with the permitting process, and they can handle everything for a fee.
3. Conduct Site Evaluation
The local agency will test the soil to determine the most efficient system for it. Some soil conditions are inefficient at filtering wastewater or have high water tables, increasing the risk of contamination. In such scenarios, an aerobic septic system works better than an anaerobic one.
4. Design the System
After the site assessment, septic system design company it's time to bring in a septic system design company. They will draft a wastewater treatment system that meets your needs while accounting for any limitations and restrictions in the design. There’s no one-size-fits-all when it comes to septic systems because of marked differences in property layouts.
5. Obtain Approval
Plans for your septic system have to be approved by the local agency first before actual work begins. It must meet the set standards and regulations; otherwise, your septic system design company will have to go back to the drawing board. Once the system is considered safe and won’t contaminate water sources, installation can commence.
For more information, contact Morse Engineering and Construction.